Video Default
Topaz Video Upscaler
Upscale uploaded videos by 1x, 2x or 4x. Billed per source second.
- Provider
- kie
- Capability
- video-upscale
- Tier
- Pro
- Cost
- From 8 credits / source second
-
Breach at dawn -
Silver shoreline -
Dune walker -
Three pears -
Deep blue -
Cabin on the ridge -
Earthrise -
Morning pines -
Rain in the alley -
Koi and petals -
Window light -
Cliff house -
Spice market -
Snow leopard
Create with Topaz Video Upscaler
Topaz Video Upscaler is already selected. Add the required inputs, review the settings and credit cost, then generate.
Parameters
- Upscale Factor
- 1 · 2 · 4
Tags
01Input
MP4, MOV or MKV · up to 50 MB and 60 seconds. Choose 1x, 2x or 4x in the settings.
Workflows to try with Topaz Video Upscaler
-
Try upscaling a source video
Provide the source video for Topaz Video Upscaler and choose an available scale setting. This workflow uses the uploaded clip without a text prompt. Watch the output at the intended display size. Compare text, edges, textures and frame-to-frame consistency with the source clip.
How to use Topaz Video Upscaler
-
Prepare your inputs
Use the AI Video Upscaler generator below this page's introduction. Add the text, image or video it requires.
-
Review Topaz Video Upscaler
Topaz Video Upscaler is already selected. Adjust its settings and review the credit cost before generating.
-
Generate and download
Run it, then download the result or find it in your creations when it is ready.
Frequently asked questions
How many credits does Topaz Video Upscaler cost?
The price uses verified source duration rounded up to whole seconds: 8 credits per second for 1x/2x, or 14 for 4x. Upload a video to see the total before submitting.
Where can I use Topaz Video Upscaler?
Use the generator on this page: Topaz Video Upscaler is already selected. It is also the default model in the AI Video Upscaler tool.
Which settings does Topaz Video Upscaler support?
On Smaltino, Topaz Video Upscaler lets you set: Upscale Factor.
Am I charged if a generation fails?
Requests rejected before task admission are not charged. When a task finally fails, the system releases reserved credits against its original debit record. Check the task and credit records for the settled balance. A status-query error alone is not a final task failure; task credit releases are not payment or subscription cash refunds.
Try Topaz Video Upscaler now
Use the generator on this page with Topaz Video Upscaler already selected for AI Video Upscaler.